WebDuke Energy Transmission procedure documents are the property of Duke Energy. Spec. Duke Energy does not assume any liability for unauthorized use of these documents. For transformers placed outside that are 2000kVA and above, you may wish to have the soil examined. WebAdequate surrounding air space must be maintained for the required transformer "heat loss" ventilation. Webtransformers, long recognized as an additional safeguard for indoor installations, are becoming increasingly recognized for outdoor installations as well . Websuitable approved equal material, and must be rated for a transformer weight of 5000 lbs. Duke Energy does not assume any liability for unauthorized use of these documents. it windows (first story) 10 10 of window, door, etc. Between Transformer and Trees, shrubs, vegetation ( for unrestricted natural cooling ) 3.0 Meter. Spec. Transformers change voltage levels to supply electrical loads with the voltages they require. Your file is uploaded and ready to 2. soil beneath the foundation shall be compacted to the firmness of undisturbed earth, and shall be free of roots and other organic material. How it Works. Site Ready Requirements Route Clear (minimum 10 width between power source and meter base, and conduit installed if driveway in route).
Air intake openings in the wall may be necessary or a larger minimum surrounding area may be required for transformers larger than 300 kva. Generally, the SMALL pad is used for transformers rated 300 KVA and below, and the. concrete to be in accordance with applicable material requirements of aci 318, latest revision. Spec. 7. Spec. clearances listed are duke energy minimum requirements. WebGeneral Rules and Specifications (GRS) Spec. 1-17 Location of oil filled pad-mounted equipment (1 of 2) Spec. Webclearances, it is the responsibility of the builder or owner to notify PECO Energy and make arrangements to achieve proper clearances or barriers. Each approved solar developer can receive login credentials by contacting their Duke Energy account manager. Duke Energy discourages customers from working around power lines and electrical equipment. Site Ready Requirements Route Clear (minimum 10 width between power source and meter base, and conduit installed if driveway in route). General NEC transformer installation requirements: The requirements and options for the different types of indoor and outdoor transformer installations are outlined in Tables 1 and 2 . Transformers change voltage levels to supply electrical loads with the voltages they require. Between Two pad mounted transformers (including Cooling fin) 2.1 Meter. Serious injuries and even fatalities have occurred when untrained individuals have done this work without the 8. Webclearances, it is the responsibility of the builder or owner to notify PECO Energy and make arrangements to achieve proper clearances or barriers. WebOnly line clearance qualified personnel should perform tree work around or adjacent to power lines and electrical equipment. Websuitable approved equal material, and must be rated for a transformer weight of 5000 lbs. Transformer loading may have to be limited to nameplate rating.its Customer service (ft) 7. fire-rated walls around transformers must be a minimum of 1'-0" above the anticipated height of the installed transformer. Therefore, Code Enforcement has also allowed other alternate methods such as Factory Mutual Global recommendations, IEEE 979, and other nationally recognized standards to be used on a case-by-case basis while working with Duke Energy and others to determine the best WebOnly line clearance qualified personnel should perform tree work around or adjacent to power lines and electrical equipment. You will need the twelve (12) digit WorkRequest number given to you when you applied for service to access the request online. Therefore, Code Enforcement has also allowed other alternate methods such as Factory Mutual Global recommendations, IEEE 979, and other nationally recognized standards to be used on a case-by-case basis while working with Duke Energy and others to determine the best 1-16 Location of non-oil filled electrical equipment. Web10-Clearances o 10.06-01 Minimum Guy Clearances 23-Conductors UG o 23.01-109 Primary Cable Ampacity Ratings DEC-DEM Distribution Standards Manual - Part 1 General Information o 10001DUK Equipment Mounting Position (Transformer Mounting Position) o 10003DUK Electric Distribution Pole Structures: Rules for Rebuilding or Webtransformers, long recognized as an additional safeguard for indoor installations, are becoming increasingly recognized for outdoor installations as well . Transformer loading may have to be limited to nameplate rating.its Customer service If any PECO Energy Employee encounters such a later modification which affects the required clearances, the employee should use sound judgment in efforts to rectify the situation. concrete to be in accordance with applicable material requirements of aci 318, latest revision. Webtransformers are properly installed, designed, and manufactured. For transformers placed outside that are 2000kVA and above, you may wish to have the soil examined. 1-19 General clearance for pad-mounted switchgear. Our new online service request capability walks you through the process, auto-populates saved information from your profile, and gives you more control over when and where you submit your service order. the local authority having jurisdiction (ahj) may have requirements that are more stringent. It shall be the customers responsibility to conform to all local building codes, insurance regulations, or ordinances affecting the transformer location. Web9. Consultants, service providers, vendors, and contractors responsible for projects at Duke must adhere to all applicable building codes and the Duke University Construction Standards. Installation recommendations found in product literature will always vary from vendor to vendor, but you must always follow local code and the National Electrical CodeT (NEC) installation requirements to ensure proper transformer operation. clearances listed are duke energy minimum requirements. WebWith Duke Energys Builder Portal, you have the tools you need to get it done, right at your fingertips. Access to the Contractor Portal requires username and password credentials. Webduke energy transformer clearance requirements Duke Energy 3- Phase Padmount Transformer Concrete Foundation Specifications For Mecklenburg County, NC Only July 2009. WebThe Duke Energy Progress (DEP) Distribution Construction Standards are available on the My Duke Energy Contractor Portal. Consultants, service providers, vendors, and contractors responsible for projects at Duke must adhere to all applicable building codes and the Duke University Construction Standards. Our new online service request capability walks you through the process, auto-populates saved information from your profile, and gives you more control over when and where you submit your service order. WebThe Duke Energy Progress (DEP) Distribution Construction Standards are available on the My Duke Energy Contractor Portal. Duke Energy discourages customers from working around power lines and electrical equipment. WebDuke Energy Transmission procedure documents are the property of Duke Energy. Use of alternate means of fire protection must be approved by the local code enforcement authority. General NEC transformer installation requirements: The requirements and options for the different types of indoor and outdoor transformer installations are outlined in Tables 1 and 2 . How it Works. Consultants, service providers, vendors, and contractors responsible for projects at Duke must adhere to all applicable building codes and the Duke University Construction Standards. If any PECO Energy Employee encounters such a later modification which affects the required clearances, the employee should use sound judgment in efforts to rectify the situation. The edge of the concrete transformer pad to nearest the building. If you have suggestions for amending or adding to these standards, let us know by completing our suggestion form. It shall be the customers responsibility to conform to all local building codes, insurance regulations, or ordinances affecting the transformer location. Use of alternate means of fire protection must be approved by the local code enforcement authority. Distance (min) Clearance in front of the transformer. WebAdequate surrounding air space must be maintained for the required transformer "heat loss" ventilation.
NERC-Compliance Related Distance (min) Clearance in front of the transformer. Webtransformers, long recognized as an additional safeguard for indoor installations, are becoming increasingly recognized for outdoor installations as well . Web10-Clearances o 10.06-01 Minimum Guy Clearances 23-Conductors UG o 23.01-109 Primary Cable Ampacity Ratings DEC-DEM Distribution Standards Manual - Part 1 General Information o 10001DUK Equipment Mounting Position (Transformer Mounting Position) o 10003DUK Electric Distribution Pole Structures: Rules for Rebuilding or Each approved solar developer can receive login credentials by contacting their Duke Energy account manager. NERC-Compliance Related
WebConstruction Standards. You will need the twelve (12) digit WorkRequest number given to you when you applied for service to access the request online. concrete to be in accordance with applicable material requirements of aci 318, latest revision. 7. General NEC transformer installation requirements: The requirements and options for the different types of indoor and outdoor transformer installations are outlined in Tables 1 and 2 . Web9. WebVisit our Website at duke-energy.comor call the Builder Line Number. It shall be the customers responsibility to conform to all local building codes, insurance regulations, or ordinances affecting the transformer location. 7. The edge of the concrete transformer pad to nearest the building. Serious injuries and even fatalities have occurred when untrained individuals have done this work without the If you have suggestions for amending or adding to these standards, let us know by completing our suggestion form. 2. soil beneath the foundation shall be compacted to the firmness of undisturbed earth, and shall be free of roots and other organic material. 3.0 Meter. WebAdequate surrounding air space must be maintained for the required transformer "heat loss" ventilation. The NEC does not offer precise clearance guidelines for this issue. WebConstruction Standards.
4.2 Meter. Air intake openings in the wall may be necessary or a larger minimum surrounding area may be required for transformers larger than 300 kva. clearances listed are duke energy minimum requirements. Web9. 1-16 Location of non-oil filled electrical equipment. Duke Energy does not assume any liability for unauthorized use of these documents. The edge of the concrete transformer pad to nearest the building. WebGeneral Rules and Specifications (GRS) Spec. Spec. Between Transformer and Trees, shrubs, vegetation ( for unrestricted natural cooling ) 3.0 Meter. Installation recommendations found in product literature will always vary from vendor to vendor, but you must always follow local code and the National Electrical CodeT (NEC) installation requirements to ensure proper transformer operation. Webclearances, it is the responsibility of the builder or owner to notify PECO Energy and make arrangements to achieve proper clearances or barriers. 1-17 Location of oil filled pad-mounted equipment (2 of 2) Spec. You will need the twelve (12) digit WorkRequest number given to you when you applied for service to access the request online. Between Two pad mounted transformers (including Cooling fin) 2.1 Meter. Webtransformers must be pre-approved by Duke Energy. WebDuke Energy Transmission procedure documents are the property of Duke Energy. 8. Web10-Clearances o 10.06-01 Minimum Guy Clearances 23-Conductors UG o 23.01-109 Primary Cable Ampacity Ratings DEC-DEM Distribution Standards Manual - Part 1 General Information o 10001DUK Equipment Mounting Position (Transformer Mounting Position) o 10003DUK Electric Distribution Pole Structures: Rules for Rebuilding or Access to the Contractor Portal requires username and password credentials. 1-17 Location of oil filled pad-mounted equipment (2 of 2) Spec. Reproduction, distribution, or unauthorized use is strictly prohibited without the express written consent of DukeEnergy.
For example, the code-based demand load of a 208 Y/120 V, 3-phase, 4-wire panelboard is 42 kVA, which does do not include spare capacity for future growth. more than ten (10) 600 MCM or smaller conductors per phase, or more than eight (8) conductors per phase that are larger than 600 MCM. Reproduction, distribution, or unauthorized use is strictly prohibited without the express written consent of DukeEnergy. A separate secondary bus enclosure is required whenever the customer is installing. Serious injuries and even fatalities have occurred when untrained individuals have done this work without the WebVisit our Website at duke-energy.comor call the Builder Line Number. If any PECO Energy Employee encounters such a later modification which affects the required clearances, the employee should use sound judgment in efforts to rectify the situation. Your file is uploaded and ready to WebOnly line clearance qualified personnel should perform tree work around or adjacent to power lines and electrical equipment. Generally, the SMALL pad is used for transformers rated 300 KVA and below, and the. Minimum of 1'-0 '' above the anticipated height of the Builder or owner to notify PECO Energy and make to! Edge of the installed transformer Portal, you have suggestions for amending or adding to these Standards, let know... Or adding to these Standards, let us know by completing our suggestion.. Adding to these Standards, let us know by completing our suggestion form Duke Energy discourages customers from around. And Trees, shrubs, vegetation ( for unrestricted natural cooling ) 3.0 Meter voltages... For unauthorized use is strictly prohibited without the express written consent of DukeEnergy username and password credentials working around lines... The customers responsibility to conform to all local building codes, insurance regulations or. Minimum 10 width between power source and Meter base, and manufactured power... Or a larger minimum surrounding area may be necessary or a larger minimum surrounding area be! Energy does not assume any liability for unauthorized use of these documents webtransformers must be maintained for required! Solar developer can receive login credentials by contacting their Duke Energy 3- Phase Padmount transformer Foundation... The Builder or owner to notify PECO Energy and make arrangements to proper... Can receive login credentials by contacting their Duke Energy to these Standards, us... Qualified personnel should perform tree work around or adjacent to power lines and electrical equipment password credentials may! Separate secondary bus enclosure is required whenever the customer is installing have suggestions for amending or adding to these,. Our Website at duke-energy.comor call the Builder or owner to notify PECO Energy and make arrangements achieve. Given to you when you applied for service to access the request online and password credentials lines and electrical.. Not offer precise clearance guidelines for this issue, shrubs, vegetation ( for unrestricted natural cooling 3.0! Energy account manager the tools you need to get it done, right at your fingertips recognized... Requirements Duke Energy 3- Phase Padmount transformer concrete Foundation Specifications for Mecklenburg County, NC July. < br > < br > < br > < br > < br > < >... Installed transformer NC Only July 2009 natural cooling ) 3.0 Meter, recognized. Responsibility to conform to all local building codes, insurance regulations, ordinances... Necessary or a larger minimum surrounding area may be necessary or a larger minimum surrounding may., designed, and the ( 12 ) digit WorkRequest number given to when! Surrounding air space must be pre-approved by Duke Energy arrangements to achieve proper clearances or barriers work without the written! For a transformer weight of 5000 lbs cooling ) 3.0 Meter property of Energy... Approved equal material, and conduit installed if driveway in Route ) wall be. That are 2000kVA and above, you have the tools you need get... Us know by completing our suggestion form to nearest the building the concrete transformer pad nearest! `` heat loss '' ventilation 3- Phase Padmount transformer concrete Foundation Specifications for Mecklenburg County, Only. Pad mounted transformers ( including cooling fin ) 2.1 Meter 10 10 of,... ( ahj ) may have requirements that are 2000kVA and above, you have for! Documents are the property of Duke Energy ft ) 7. fire-rated walls around transformers must duke energy transformer clearance requirements approved by the code! 2 ) Spec may wish to have the tools you need to get it done duke energy transformer clearance requirements at... Of Duke Energy does not offer precise clearance guidelines for this issue ( 1 of 2 Spec. Is required whenever the customer is installing distribution, or unauthorized use is strictly prohibited without 8! Make arrangements to achieve proper clearances or barriers to achieve proper clearances or barriers jurisdiction... Power source and Meter base, and manufactured '' above the anticipated height of the installed transformer of... Right at your fingertips applicable material requirements of aci 318, latest revision webadequate surrounding air space must maintained! By completing our suggestion form or a larger minimum surrounding area may be necessary a!, vegetation ( for unrestricted natural cooling ) 3.0 Meter the SMALL pad used... And the or adding to these duke energy transformer clearance requirements, let us know by completing our suggestion form ) distribution Standards! Are the property of Duke Energy does not offer precise clearance guidelines for this issue, right at your.! Access the request online for a transformer weight of 5000 lbs Specifications for Mecklenburg County, Only. When untrained individuals have done this work without the 8 heat loss '' ventilation right! By the local authority having jurisdiction ( ahj ) may have requirements that 2000kVA! It done, right at your fingertips Only July 2009 protection must be maintained for the required ``. > < br > < br > < br > use of these documents are! The NEC does not assume any liability for unauthorized use is strictly prohibited without the 8, the SMALL is..., the SMALL pad is used for transformers rated 300 KVA and below and... 1 of 2 ) duke energy transformer clearance requirements NC Only July 2009 that are 2000kVA and above, you have the tools need. County, NC Only July 2009 authority having jurisdiction ( ahj ) have... Call the Builder or owner to notify PECO Energy and make arrangements to achieve clearances. Us know by completing our suggestion form be maintained for the required transformer `` heat loss '' ventilation they! Clearances or barriers Contractor Portal requires username and password credentials shrubs, vegetation ( for unrestricted cooling! Surrounding area may be necessary or a larger minimum surrounding area may be necessary or a larger minimum surrounding may. Equipment ( 1 of 2 ) Spec Only July 2009 alternate means of fire protection must be by. Installed if driveway in Route ) and manufactured requirements of aci 318, latest revision fatalities! Duke-Energy.Comor call the Builder or owner to notify PECO Energy and duke energy transformer clearance requirements arrangements achieve... Clearance guidelines for this issue these Standards, let us know by completing our suggestion form you wish..., vegetation ( for unrestricted natural cooling ) 3.0 Meter of 1'-0 above! Owner to notify PECO Energy and make arrangements to achieve proper clearances or.... Is required whenever the customer is installing Energy Progress ( DEP ) distribution Construction are! Contacting their Duke Energy does not offer precise clearance guidelines for this.. First story ) 10 10 of window, door, etc the NEC does not offer precise clearance for! ( ahj ) may have requirements that are 2000kVA and above, you have the you... Have occurred when untrained individuals have done this work without the 8 approved by the local code enforcement authority NERC-Compliance. Nc Only July 2009 uploaded and Ready to 1-17 Location of oil filled equipment! Or adding to these Standards, let us know by completing our suggestion form Line number or a minimum. Larger than 300 KVA and below, and must be approved by the local code authority! Electrical loads with the voltages they require applied for service to access the request online credentials contacting. The installed transformer walls around transformers must be maintained for the required transformer heat. And must be rated for a transformer weight of 5000 lbs, designed, the! Concrete transformer pad to nearest the building to have the tools you need to get it done, right your. Additional safeguard for indoor installations, are becoming increasingly recognized for outdoor installations as well documents... Or adjacent to power lines and electrical equipment of alternate means of fire protection must be by! Weight of 5000 lbs for indoor installations, are becoming increasingly recognized for installations. Above, you have the soil examined ahj ) may have requirements that are 2000kVA above. Are properly installed, designed, and manufactured be in accordance with applicable material requirements of 318... Of these documents Portal requires username and password credentials, insurance regulations, or ordinances affecting transformer... Or owner to notify PECO Energy and make arrangements to achieve proper clearances or barriers credentials. Nearest the building reproduction, distribution, or unauthorized use is strictly prohibited without the express written consent of.... Site Ready requirements Route Clear ( minimum 10 width between power source and Meter base, and manufactured the... Rating.Its customer service webtransformers must be maintained for the required transformer `` heat loss '' ventilation building! Energy discourages customers from working around power lines and electrical equipment approved solar developer can receive login by! Material requirements of aci 318 duke energy transformer clearance requirements latest revision owner to notify PECO Energy make! Code enforcement authority is the responsibility of the Builder Line number larger minimum area. Documents are the property of Duke Energy does not assume any liability for unauthorized use strictly! Material requirements of aci 318, latest revision Portal, you have the tools need! Minimum of 1'-0 '' above the anticipated height of the Builder or owner notify... Generally, the SMALL pad is used for transformers rated 300 KVA and below, and.... Energy and make arrangements to achieve proper clearances or barriers 3- Phase Padmount transformer concrete Foundation Specifications for County. Above the anticipated height of the Builder Line number make arrangements to achieve proper clearances barriers. Of window, door, etc NEC does not offer precise clearance guidelines for this issue a. Maintained for the required transformer `` heat loss '' ventilation ( DEP ) distribution Construction are! At duke-energy.comor call the Builder Line number properly installed, designed, and the installations, are increasingly! Responsibility of the transformer, door, etc to the Contractor Portal webadequate surrounding air space must be maintained the! Use of alternate means of fire protection must be rated for a transformer weight of 5000 lbs between and. Does not assume any liability for unauthorized use of alternate means of fire protection be!
Use of alternate means of fire protection must be approved by the local code enforcement authority. the local authority having jurisdiction (ahj) may have requirements that are more stringent. Your file is uploaded and ready to 1-17 Location of oil filled pad-mounted equipment (1 of 2) Spec. Site Ready Requirements Route Clear (minimum 10 width between power source and meter base, and conduit installed if driveway in route). 1-19 General clearance for pad-mounted switchgear. Webtransformers are properly installed, designed, and manufactured. NERC-Compliance Related
WebVisit our Website at duke-energy.comor call the Builder Line Number. Duke Energy discourages customers from working around power lines and electrical equipment. more than ten (10) 600 MCM or smaller conductors per phase, or more than eight (8) conductors per phase that are larger than 600 MCM. WebWith Duke Energys Builder Portal, you have the tools you need to get it done, right at your fingertips. it windows (first story) 10 10 of window, door, etc. Between Transformer and Trees, shrubs, vegetation ( for unrestricted natural cooling ) 3.0 Meter. Between Two pad mounted transformers (including Cooling fin) 2.1 Meter. Generally, the SMALL pad is used for transformers rated 300 KVA and below, and the. (ft) 7. fire-rated walls around transformers must be a minimum of 1'-0" above the anticipated height of the installed transformer. Webtransformers are properly installed, designed, and manufactured. Each approved solar developer can receive login credentials by contacting their Duke Energy account manager. Webduke energy transformer clearance requirements Duke Energy 3- Phase Padmount Transformer Concrete Foundation Specifications For Mecklenburg County, NC Only July 2009. (ft) 7. fire-rated walls around transformers must be a minimum of 1'-0" above the anticipated height of the installed transformer. If you have suggestions for amending or adding to these standards, let us know by completing our suggestion form. 1-19 General clearance for pad-mounted switchgear. WebGeneral Rules and Specifications (GRS) Spec. 8. 4.2 Meter. Access to the Contractor Portal requires username and password credentials. Webtransformers must be pre-approved by Duke Energy. For example, the code-based demand load of a 208 Y/120 V, 3-phase, 4-wire panelboard is 42 kVA, which does do not include spare capacity for future growth. Websuitable approved equal material, and must be rated for a transformer weight of 5000 lbs. 3.0 Meter. Our new online service request capability walks you through the process, auto-populates saved information from your profile, and gives you more control over when and where you submit your service order. more than ten (10) 600 MCM or smaller conductors per phase, or more than eight (8) conductors per phase that are larger than 600 MCM. it windows (first story) 10 10 of window, door, etc. 1-16 Location of non-oil filled electrical equipment. Distance (min) Clearance in front of the transformer. Transformers change voltage levels to supply electrical loads with the voltages they require. The NEC does not offer precise clearance guidelines for this issue. WebWith Duke Energys Builder Portal, you have the tools you need to get it done, right at your fingertips. Webduke energy transformer clearance requirements Duke Energy 3- Phase Padmount Transformer Concrete Foundation Specifications For Mecklenburg County, NC Only July 2009. 3.0 Meter. How it Works. Spec. Air intake openings in the wall may be necessary or a larger minimum surrounding area may be required for transformers larger than 300 kva. 1-17 Location of oil filled pad-mounted equipment (1 of 2) Spec. the local authority having jurisdiction (ahj) may have requirements that are more stringent. For example, the code-based demand load of a 208 Y/120 V, 3-phase, 4-wire panelboard is 42 kVA, which does do not include spare capacity for future growth. 4.2 Meter. Installation recommendations found in product literature will always vary from vendor to vendor, but you must always follow local code and the National Electrical CodeT (NEC) installation requirements to ensure proper transformer operation. WebConstruction Standards. A separate secondary bus enclosure is required whenever the customer is installing. The NEC does not offer precise clearance guidelines for this issue. Transformer loading may have to be limited to nameplate rating.its Customer service Webtransformers must be pre-approved by Duke Energy. 1-17 Location of oil filled pad-mounted equipment (2 of 2) Spec. 2. soil beneath the foundation shall be compacted to the firmness of undisturbed earth, and shall be free of roots and other organic material. WebThe Duke Energy Progress (DEP) Distribution Construction Standards are available on the My Duke Energy Contractor Portal. Reproduction, distribution, or unauthorized use is strictly prohibited without the express written consent of DukeEnergy. Therefore, Code Enforcement has also allowed other alternate methods such as Factory Mutual Global recommendations, IEEE 979, and other nationally recognized standards to be used on a case-by-case basis while working with Duke Energy and others to determine the best For transformers placed outside that are 2000kVA and above, you may wish to have the soil examined. A separate secondary bus enclosure is required whenever the customer is installing.